| Location |
Closure Dates |
Lanes Closed |
Reason |
| Street |
From |
To |
From |
To |
|
|
| Moreno Beach Drive and Route 60 |
Westbound ramp/Moreno Beach Intersection |
Trail Ridge Way |
January 2013 |
Sept. 2013 |
Intermittent day and night closures of ramps, Moreno Beach Drive and Eucalyptus |
For construction of new eastbound on-ramp, new eastbound off-ramp and Eucalyptus Ave. For specific questions please call Marge Lazarus at 951.413.3133. |
| San Michele Road |
Indian Avenue |
Heacock Street |
January 2013 |
July 2013 |
Partial Lane closures during work hours. One lane in each direction will remain open at all times |
For construction of underground utilities, storm drain, water, sewer and public improvements associated with PA06-0021, I-215 Logistics, LLC Tremmell Crow Co. For specific questions, please contact Alex Ramirez at 951.413.3123 |
| Heacock |
Nandina Avenue |
Cardinal Avenue |
February 2013 |
June 2013 |
Full lane closure pending approval |
For construction of underground utilities, water, trench repairs, street improvements associated with PA06-0021, I-215 Logistics, LLC Tremmell Crow Co. For specific questions, please contact Alex Ramirez at 951.413.3123. |
| Indian Avenue |
Nandina Avenue |
San Michele Road |
January 2013 |
May 2013 |
Partial Lane closures during work hours. One lane in each direction will remain open at all times |
For construction of underground utilities, water, trench repairs, associated with PA06-0021, I-215 Logistics, LLC Tremmell Crow Co. For specific questions, please contact Alex Ramirez at 951.413.3123. |
| Perris Boulevard |
Perris Valley Storm Drain Lateral “B” (Southerly City Limits) |
Cactus Avenue |
July 2012 |
May 2013 |
Partial lane closures during work hours. |
This project will construct street widening to a uniform six travel lanes, concrete curb and gutter, sidewalk, curb ramps, driveway approaches, minor drainage improvements, utility relocation, and relocated traffic signals. For specific questions, please call Larry Gonzales at 951.413.3136. |
| Kentland Lane |
Eucalyptus Avenue |
South End |
January 2013 |
April 2013 |
Partial Lane closures during work hours. Access to residence and driveway will remain accessible at all times |
The improvement will provide new asphaltic pavement for 24’ wide roadway on Kentland Lane. The project also includes the new signage and striping for the new improvement. For specific questions, please contact Henry Ngo at 951.413.3106. |
| Wilson Place and Kenny Drive |
Hubbard Street |
Hilton Drive |
January 2013 |
April 2013 |
Partial Lane closures during work hours. Access to residence and driveway will remain accessible at all times |
The improvement will provide new asphaltic pavement for 24’ wide roadway on Wilson Place and Kenny drive. The project also includes the new signage and striping for the new improvement. For specific questions, please contact Henry Ngo at 951.413.3106. |
| Alessandro Boulevard |
Indian Street |
600 Feet West |
January 28, 2013 |
April 30, 2013 |
Partial lane closures on north side of Alessandro Blvd during work hours. Access to businesses will remain open at all times. |
For removal and reconstruction of sidewalk, driveway approach, curb, gutter and pavement. For specific questions, please call Quang Nguyen at 951.413.3159. |
| Sunnymead Ranch Parkway |
Heacock Street |
Perris Boulevard |
February 4, 2013 |
April 30, 2013 |
Partial lane closures on Sunnymead Ranch Parkway during work hours. Accesses to side streets will remain open at all times. |
For removal of existing traffic striping, slurry seal of street pavement surface, and reestablishment of traffic striping. For specific questions, please call Quang Nguyen at 951.413.3159. |
| Ironwood |
Kristen Court |
Tabor Drive |
January 2013 |
April 2013 |
Partial Lane closures during work hours. One lane in each direction will remain open at all times |
For construction of underground utilities for SCE by VCI. EP2012-0240 (amended) For specific questions, please contact Alex Ramirez at 951.413.3123 |